Pakistani engineer working for Diamer Basha Dam lauds Chinese staff’s support
“Water storage capacity is 56 days currently while it’s only 35 days before. As well as big changes in environmental and climatic conditions, the huge amount of storage capacity of water also makes the land more suitable for the production of crops and our irrigation system has also been improved,” Nadeem added.
Diamer Basha Dam contract was awarded to PowerChina and Frontier Works Organisation(Pakistan) in 2020. Upon completion, the dam would produce 4,800 megawatts of electricity through hydropower generation, store an extra 10.5 cubic kilometers of water for Pakistan that would be used for irrigation and drinking, extend the life of Tarbela Dam located downstream by 35 years, and control flood damage by the River Indus downstream during high floods in Pakistan, according to PowerChina.
However, building such a super project will not be easy. “At the initial stage, we have faced hindrances such as raging COVID-19 pandemic and poor geological conditions. Among these risk factors, worker availability, site accessibility, shortage of construction materials, and inadequate epidemic prevention materials caused by the lockdown policy are the most fundamental challenges encountered by the projects.”“We have resolved almost these problems and the residential area is shifted near the working site, proper rest area for workers has been set aside by local community, facilities have been provided at the working site and the security is also increased,” Nadeem said.
The local employees are the backbone of Diamer Basha Dam, and Nadeem is one of them. As an engineer, Nadeem has grown with the project. “Diamer Basha dam is the largest dam in the history of Pakistan and will be the tallest roller compacted concrete dam in the world, where I can learn more technical skills to build my career.”“In 2021, the Chinese Embassy in Pakistan hosted an awarding ceremony to commend outstanding Pakistani staff of CPEC projects. PowerChina nominated me for the prize which was an honor for me and my family. I am sincerely appreciating PowerChina for offering me the opportunity of working here. I have enhanced my capability, improved my work efficiency, and received a higher salary,” he said. “I am proud to work at PowerChina.”
Comment / Reply From
Popular Posts
Newsletter
Subscribe to our mailing list to get the new updates!
