All agenda has been finalized for smooth and seamless unveiling of the projects. Gwadar Port Authority Chairman Naseer Ahmed Kashani expressed his immense joy for formal ribbon-cutting ceremonies of the 19–kilometer-long six-lane Eastbay Expressway and 1.2 MGD desalination plant.
Eastbay Expressway is a dedicated CPEC artery linking Gwadar port to China. Eastbay Expressway aims to provide primary connectivity between the port & its Free Zone I and Free Zone II with Makran Coastal Highway (N-10) and Motorway 8 (CPEC’s Western route) for smooth logistic transportation of import, export, and transit goods to Khujrab, border of China.
Eastbay Expressway’s all relevant work including road marking, installation of cat-eyes, erection of boards of signage & direction signs and installation of cameras has been completed with precision. GPA has already conduced successfully its test run in a smooth manner.
Sources in GPA said that since the beginning till date around 1,300 locals of Gwadar have been employed.
Meanwhile, PM Shehbaz Sharif has planned to inaugurate a 1.2 MGD (million gallon per day) Water Desalination Plant, which is being constructed in the premises of Gwadar Port Free Zone area.